WWT’s larger team allowed for us to help out the Canadian Red Cross after the 2013 flood.
Kim Sivertson joined the team.
We started representing Neutralox and World Water Works.
Project highlights:
- Harrison Hot Springs WTP (Aslan UF)
- Evan Thomas WWTP (IPEC Screens, Vaughan Chopper Pumps, KSB Pumps, Boerger Pumps, Aerzen Blowers)
- Anzac WWTP (IPEC Screens, Vaughan Chopper Pumps, KSB Pumps, Hydro Grit System, Aerzen Blowers)
- Valleyfield Receiving Station Odour Control (Neutralox PI)
- Winnipeg NEWPCC (Vaughan Digester Rotamix)